29/Mar/2020 | 87085099 | Bridge braces made of iron and steel (LKPT replaces trucks with a total load of 11 tons and is 100% TQSX) | China | piece/pcs | 2.00 | 20.82 | 10.41 | View Importer | View Supplier |
29/Mar/2020 | 87085099 | Bridge braces made of iron and steel (LKPT replaces trucks with a total load of 13 tons and is 100% of TQSX) | China | piece/pcs | 2.00 | 21.19 | 10.59 | View Importer | View Supplier |
29/Mar/2020 | 87085099 | Planetary gear ring (part of bridge) made of iron and steel (LKPT replaces a truck with total tonnage of 15 tons and 100% TQSX) | China | piece/pcs | 29.00 | 157.21 | 5.42 | View Importer | View Supplier |
29/Mar/2020 | 87085099 | Bridge cover made of bridge parts made of iron (LKPT replaces trucks with a total tonnage of 4 tons of new 100% TQSX) | China | piece/pcs | 13.00 | 39.56 | 3.04 | View Importer | View Supplier |
27/Mar/2020 | 87085099 | Bridge cover with active iron, high size from 30cm long 70cm used for trucks with a total TTĐ 7 tons, 100% new | China | piece/pcs | 3.00 | 12.00 | 4.00 | View Importer | View Supplier |
21/Mar/2020 | 87085099 | Trailers, (bridge components) made of iron, 90cm long and 80cm wide, used for trucks with a total TLT of over 20 tons, 100% new | China | piece/pcs | 14.00 | 56.00 | 4.00 | View Importer | View Supplier |
21/Mar/2020 | 87085099 | Bridge cover with active iron, high size from 30cm long 70cm used for trucks with a total TTĐ 7 tons, 100% new | China | piece/pcs | 5.00 | 20.00 | 4.00 | View Importer | View Supplier |
20/Mar/2020 | 87085099 | Differential skull of iron. (Under the active bridge) used for ben trucks of 3 tons, 5 tons, 7 tons, 8 tons, 10 tons and 12 tons. New 100 %. Spare parts | China | piece/pcs | 70.00 | 210.00 | 3.00 | View Importer | View Supplier |
20/Mar/2020 | 87085099 | Iron beam support flanges (part of the bridge) for ben trucks (3-12) tons. 100% new. Spare parts | China | piece/pcs | 240.00 | 192.00 | 0.80 | View Importer | View Supplier |
20/Mar/2020 | 87085099 | Iron metal A-shaped bracing tie rods (part of the bridge) for ben-type trucks (3-12) tons. New 100 %. Spare parts | China | piece/pcs | 120.00 | 72.00 | 0.60 | View Importer | View Supplier |
20/Mar/2020 | 87085099 | Bracing ball (part of the bridge) phi 80 - 105 mm of iron + vulcanized rubber used for trucks. New 100 %. Spare parts | China | piece/pcs | 2,940.00 | 2,940.00 | 1.00 | View Importer | View Supplier |
20/Mar/2020 | 87085099 | Bridge housings made of iron and steel (LKPT replaces trucks with a total load of 15 tons, which is 100% new TQSX) | China | piece/pcs | 2.00 | 18.11 | 9.06 | View Importer | View Supplier |
20/Mar/2020 | 87085099 | Bridge bracing made of iron and steel (LKPT replaces trucks with a total load of 15 tons, which is 100% of TQSX) | China | piece/pcs | 5.00 | 53.88 | 10.78 | View Importer | View Supplier |
20/Mar/2020 | 87085099 | Bridge braces made of iron and steel (LKPT replaces trucks with a total load of 38-40 tons and is 100% TQSX) | China | piece/pcs | 120.00 | 1,347.84 | 11.23 | View Importer | View Supplier |
19/Mar/2020 | 87085099 | Based on iron (parts of bridge) of iron used for trucks (8-15), 100% new (spare parts) | China | piece/pcs | 50.00 | 37.50 | 0.75 | View Importer | View Supplier |